SK Hynix plans to place a bulk order for next-generation HBM hybrid bonding equipment from BESI
According to Seoul Economy on November 20, SK Hynix plans to place initial orders for next-generation high-bandwidth memory hybrid bonding equipment used to stack DRAM to 16 layers and above in bulk to the Dutch equipment supplier BESI. The company has transported BESI equipment to its facility in Cheongju, North Chungcheong Province for trial operation, and subsequent equipment is also planned to be supplied by BESI. The semiconductor equipment industry states that SK Hynix is verifying the DRAM bonding performance with BESI equipment at the Cheongju campus. Hybrid bonding reduces the chip spacing by directly bonding DRAM chips. BESI has been jointly developing hybrid bonding systems with Applied Materials in the United States for the past six years.
During a performance conference call on the 22nd of last month, BESI stated that it received orders for hybrid bonding equipment for HBM development and next-generation thermal compression bonding equipment from a major memory manufacturer in the third quarter, which Seoul Economy identified as SK Hynix. SK Hynix is currently testing two hybrid bonding devices in Cheongju to verify quality, one of which is supplied by BESI, and the other is from Hanwha Semitech, a subsidiary of Hanwha Vision. Hanmi Semiconductor is developing hybrid bonding equipment at the request of SK Hynix, but it has not yet reached the stage of delivering evaluation equipment.
SK Hynix's adoption of hybrid bonding is due to the increased difficulty in controlling the overall thickness of HBM within specifications as the number of DRAM die stacking layers increases. The existing process places metal bumps that transmit electrical signals between DRAM dies, while hybrid bonding bonds the copper contacts and insulating film on the chip surface without bumps, thereby utilizing the space occupied by bumps for further stacking. Industry insiders indicate that BESI's hybrid bonding equipment can control the alignment error of the copper contacts between the upper and lower chips to within 100 nanometers, while the error for Korean equipment such as Hanmi Semiconductor and Hanwha Semitech is about 500 nanometers, which may only be used in some mass production lines in the future.